November 11, 2010
Update on Enviro Turf
by Jimmy Mitchell/David Stockstill
Edited by Carey Meitzler
The Picayune Maroon Tide Touchdown Club (MTTDC) has been approved by the school board to proceed
with fundraising efforts to replace the existing grass field with Enviro Turf (artificial turf). This effort will cost
approximately $600,000 to complete with the funding coming from different sources, none of which will
cost the school system anything.
Benefits of the EnviroTurf athletic field:
Harmful pesticides and fertilizers are required to maintain natural grass
Watering a grass field uses up to 50,000 gallons of water during the growing season
45,000 tires are recycled to create the average synthetic turf field.
99.95% of all foreign fibers are removed from the rubber.
All weather playability. The field is in condition to be played on no matter how much rain is received.
Increased use. Because ETS fields do not require ‘resting periods' like natural grass fields, ETS fields
can be used for multiple sports.
Minimal to no maintenance. No fertilizing, watering, or mowing. Enabling you to save your money and
your resources.
Synthetic turf is a safe alternative for the environment while providing a safer surface for players, children,
pets, and wildlife
All the rubber is laboratory-tested to ensure the highest standards in particle size distribution, moisture,
ash content, and chemical content.
The MTTDC must first establish itself as a 501(c)(3) non-profit organization in order to proceed with the
project in order to allow for the donations to be properly recorded for those (businesses & individuals)
who donate/purchase advertising or donate services or money.
The funding for this project will come from the following sources:
In-kind donations for base work (by a local company) to prepare the field for installing the turf.
7ft x 10ft advertising panels to be sold at an annual cost of $5K with a 10 yr. commitment. The panels
are a part of the turf and would be placed between the sideline and the track and stretch from the 25 yard
line to the goal line on each side of the bench area.
Other standard TD Club fund raising activities.
Timing of the project is essential to getting the turf installed without interfering with track season or
graduation ceremonies. The project normally takes between 4 to 8 weeks and could be started as
early as the day after graduation.
Estimated project cost
Installation cost of the Enviro Turf |
$ 600,000 |
Base work (donated by local company ) |
$148,000 |
Amount left to finish project |
$ 451,865 |
|
|
Interest on 10 yr loan of ($452K) secured by MTTDC @ 4.5% |
$110,000 |
Total Project cost |
$562,000 |
Total annual commitment ($562K / 10 years) |
$ 56,200 |
Anyone interested in donating and/or helping with the fund raising can contact any
MTTDC member or this website at maroontide@bellsouth.net and we will forward the
info to them.
Below is an artist rendition of how the field may look once installed.